Use as a document completeness prompt. It does not specify design criteria or establish code compliance.
| Done | Action | Owner or notes |
|---|---|---|
| Identify the project scope, location, report purpose, and responsible preparers. | ||
| List source documents, survey information, and data limitations. | ||
| State the criteria and authority requirements confirmed for the project. | ||
| Describe existing conditions and assumptions using project-specific evidence. | ||
| Document the selected analysis methods and inputs for professional review. | ||
| Explain alternatives considered and the basis recorded by the responsible team. | ||
| Coordinate proposed measures with grading, utilities, planting plans, and other disciplines. | ||
| Include required figures, calculations, appendices, and references. | ||
| Check internal consistency, revision status, and review approvals. | ||
| State limitations and unresolved items clearly for the project record. |
Educational information only, not engineering, legal, tax, or investment advice. Licensed PE judgment and applicable local codes govern project decisions. Calculators and planning frameworks provide estimates only.
Print or copy the relevant list, assign an owner, and record follow-up actions. These checklists help organize work; they do not certify readiness, suitability, safety, or compliance.
